PATboard Storymappr Story Development Tool Set – Professional Creative Project Planner - Magnetic Index Card Board – Beat Board – Scene Cards for Writers, Screenwriters and Content Creators
$238.95
Brand: PATBOARD
Features:
- ✅ THE ULTIMATE STORY MAPPING TOOL SET: A professional-grade version of the industry standard “Index Card” story mapping system used by creative professionals and highly recommended by writing experts such as Syd Field, Blake Snyder, and Robert McKee.
- ✅ CREATE LIKE A PRO: When it comes to creating, developing, and successfully finishing projects with story mapping, many professional writers, creative teams, and companies prefer the intuitive, “hands-on” interaction with physical cards and a full-sized work board over software-based options.
- ✅ WORLD’S BEST REWRITABLE CARDS: Designed by PATboard, the creator of the world’s #1 sustainable agile tools, our cards are magnetic, stackable, reusable, write like paper, erase easily with water, and feature bendable tabs that make the cards easy to grab and move.
- ✅VERSATILE & POWERFUL: Storymappr is designed to improve productivity and results for a wide range of creative and corporate projects, including books/screenplays, advertising/marketing, education/training, nonfiction/documentary, interactive/social content, and many more.
- ✅PLUG-AND-PLAY: Includes step-by-step instructions and everything you need to transform a whiteboard or magnetic surface into a detailed, step-by-step breakdown of your project.
EAN: 8719979941413
Collections: Office and School Supplies
Tags: PATBOARD, United States
Type: Office and School Supplies
Vendor: PATBOARD